Home Depot Sitework
General Contractor: Newfield Construction
Contact: Chuck Grabowski
860-953-1477
Contract value: $3,000,000.00
Project Highlights:
10-acre site, with very poor draining material. Town required that no material leave the site. Aggressive schedule, project started January 1999, store opened October 1999.
Contact: Chuck Grabowski
860-953-1477
Contract value: $3,000,000.00
Project Highlights:
10-acre site, with very poor draining material. Town required that no material leave the site. Aggressive schedule, project started January 1999, store opened October 1999.
- 80,000 cy cuts and fills
- 16,000 sf of segmented retaining walls
- 7,000 sf of Double Wall retaining wall system ( requiring 20’ cut with soldier piling & lagging to support Narrison Road)
- Excavation and back fill for 110,000 sf building foot print
- Complete on site septic system including 10,000 cy of imported septic fill. System was designed, inspected and approved by Fuss and O’Neill, Inc.
- Install sewer pumping station with 5,000 gal concrete holding chamber.
- Install 1,600 lf of 8” ductile iron water main.
- 6,000 lf of various ADS drainage.